Our place is at the plastering stage, we had our preplaster inspection a few weeks back and met with our SS for reinspection to go over all the defects which had been rectified before the sheets where put up. So far our SS has been great, very organised and takes pride in his work.
Our 1st floor bricks were cleaned on Tuesday, and our Bi fold doors has been delivered. Official lock up should be this week, will have to drop by tomorrow to check.
wall insulation batts where up on 9th July and ceiling batts where up on 23rd July.
Study room
Sheets up on 26th July.
Kitchen with wider fridge space option
Our bi-fold doors on site 27th July.
Thursday, 28 July 2011
Monday, 11 July 2011
Glass splashback
We have decided to change back to the standard green tinge/clear splashback for the kitchen and the galley due to the joins. I really loved the low iron candlebark colour but I just don't like the 3 piece splashback for such a short wall!
So here it is, the re-selection.
So here it is, the re-selection.
Wednesday, 6 July 2011
Plumbing and electrical started
Have been very busy for the past 4 weeks spending time with family members visiting us.
We did see our SS a week or so ago and was told that the build will probably finish in September! I was shocked!! Really?? How can they complete in September I ask my self, of course I am not complaining but that is really fast!!!. Fingers cross we will be in before Xmas! :)
Brickies hard at work. It was freezing outside!!!!
The plaster and architraves are here too.
There's a lot of pink spray paint marks on the frames, some says not level others has scribbles on the boards.
Another pink scribble.
A lot of wires and pipes :)
We did see our SS a week or so ago and was told that the build will probably finish in September! I was shocked!! Really?? How can they complete in September I ask my self, of course I am not complaining but that is really fast!!!. Fingers cross we will be in before Xmas! :)
Brickies hard at work. It was freezing outside!!!!
The plaster and architraves are here too.
There's a lot of pink spray paint marks on the frames, some says not level others has scribbles on the boards.
Another pink scribble.
A lot of wires and pipes :)