We have decided to change back to the standard green tinge/clear splashback for the kitchen and the galley due to the joins. I really loved the low iron candlebark colour but I just don't like the 3 piece splashback for such a short wall!
So here it is, the re-selection.
Monday, 11 July 2011
Wednesday, 6 July 2011
Plumbing and electrical started
Have been very busy for the past 4 weeks spending time with family members visiting us.
We did see our SS a week or so ago and was told that the build will probably finish in September! I was shocked!! Really?? How can they complete in September I ask my self, of course I am not complaining but that is really fast!!!. Fingers cross we will be in before Xmas! :)
Brickies hard at work. It was freezing outside!!!!
The plaster and architraves are here too.
There's a lot of pink spray paint marks on the frames, some says not level others has scribbles on the boards.
Another pink scribble.
A lot of wires and pipes :)
We did see our SS a week or so ago and was told that the build will probably finish in September! I was shocked!! Really?? How can they complete in September I ask my self, of course I am not complaining but that is really fast!!!. Fingers cross we will be in before Xmas! :)
Brickies hard at work. It was freezing outside!!!!
The plaster and architraves are here too.
There's a lot of pink spray paint marks on the frames, some says not level others has scribbles on the boards.
Another pink scribble.
A lot of wires and pipes :)
Monday, 27 June 2011
Garage taking shape :)
A little more bricks here and there and our garage is taking shape. Yay!!
Our garage, wished we had a bigger block for a wider garage :(
Portico bricked!
Our ground floor is nearly completed.
Rubbish/broken bricks/tiles etc was being removed *^_^*
Our garage, wished we had a bigger block for a wider garage :(
Portico bricked!
Our ground floor is nearly completed.
Rubbish/broken bricks/tiles etc was being removed *^_^*
Monday, 20 June 2011
Bricks!!!
After more than a week away, we have bricks, solar panel on, and our heating/cooling unit is installed. Just need to arrange the re-inspection for frame stage before lock up stage is completed.
Portico being bricked.
Ground floor bricks should be completed by this week.
View from back
It is so good to be home after being stranded in New Zealand due to the ash clouds. Home sweet home :)
Portico being bricked.
Ground floor bricks should be completed by this week.
View from back
It is so good to be home after being stranded in New Zealand due to the ash clouds. Home sweet home :)
Tuesday, 7 June 2011
Frame stage inspection done and roof is on
We meet up with our SS on Monday to go through the house, he pointed out that we have a overhang problem on the garage/laundry wall side which he will get the engineers to look at and rectify. Rob from New Home Inspection did our frame stage inspection and there were only 7 items which needed to be rectified. I have emailed our SS the inspection report and called him to let him know that I have sent it and ask if he can provide in writing how those items will be rectified and to arrange a date for re-inspection.
We will be going to New Zealand for a week so went to our site to take some photo's of latest stage. ROOF!
Sun shining on our house :)
View from the side
View from back
Under the roof :) , didn't see any cracks or broken tiles so that's a good sign.
Saturday, 4 June 2011
Windows on ground floor
We visited the site on Friday afternoon and the windows were on, frame stage should have been completed on Friday and we have a site meeting with our SS on Monday. Also received the invoice by email from the accounts department on the same day!. Boy they are quick in sending invoices...been waiting for the revised final working drawings for a month and still haven't received it yet!.
Front View of house
Cloak room window on right and study room windows on the left.
Study, lounge and dinning room windows
View from back of house.
Ground floor windows are in but 1st floor has not been installed yet.
Dining room windows and opening for Bi fold doors
Theater room windows on left and family room windows on right.
We will probably drop by again before Monday and take some photo's of the 1st floor windows.
Wednesday, 1 June 2011
Roof trusses are here!
It seems that our SS is very organised, once the slab was poured the frames arrived, 1 day before the 1st floor is completed the roof trusses arrived, everything seems to be arriving on time! There is no time wasting.
The guys are hard at work. This was taken around lunch time 1pm.
View from back corner of house.
Roof trusses :)
The guys are hard at work. This was taken around lunch time 1pm.
View from back corner of house.
Roof trusses :)